Project Description
Main Street Improvements Project Phase IV
Main Street Improvements Project Phase IV
Client: Borough of Bloomsbury, NJ
Onorati Construction was awarded Phase IV of the “Main Street Improvements Project” contract in the Borough of Bloomsbury. This contract had required OCC to install 670 LF 24″ Reinforced Concrete Pipe (RCP) Class V throughout the center of the roadway. OCC was also required to remove and install roughly 1700LF 8″x9″x18″ Concrete Vertical Curb. This roadway only required milling throughout the curb line. and OCC installed new asphalt overlay. Working in tandem with Colliers Engineering (formerly Maser Consulting) OCC completed the project successfully, and under budget/within time requirements.
Project Details
Contract Value:
$305,487.00
New Asphalt:
730 Tons
8″x9″x18″ Concrete Vertical Curb:
1700 LF
24″ Class V RCP Slip Joint:
670 LF